Work Executed For:
Pearl Petro Industry (Pvt.)Ltd

Total Capacity:
2.5 MWp

Categories:
Grid Tied & Net-Metering System

Name and location:
Pearl Petro Industry (Pvt.)Ltd          Main FerozPur Road, Lahore

2.5 MWp Pearl Petro Industry (Pvt.)Ltd

Going solar is a positive step towards reducing environmental impact and energy costs. ๐€ ๐ฅ๐ž๐š๐๐ข๐ง๐  ๐๐จ๐ฅ๐ฒ๐ฆ๐ž๐ซ & ๐๐ฅ๐š๐ฌ๐ญ๐ข๐œ ๐ˆ๐ง๐๐ฎ๐ฌ๐ญ๐ซ๐ฒ Pearl Petro (Pvt) Ltd goes solar with a capacity of ๐Ÿ.๐Ÿ“๐Œ๐– powered by ๐„๐๐‘ ๐„๐ง๐ž๐ซ๐ ๐ฒ ๐๐š๐ค๐ข๐ฌ๐ญ๐š๐ง ๐๐ฏ๐ญ. ๐‹๐ญ๐, the industry can reduce its carbon footprint, decrease its reliance on non-renewable energy sources, and potentially save money in the long run. The project is a Grid-Tied and net-metering System with an
annual generation of 3,130.6 MWh and an annual electricity savings of PKR 78,265,00. Furthermore, it will save the environment up to 1117.2 Tons in carbon emissions.

EBR Energy

Reasons to Go Solar

Uninterrupted  Industrial Power