Work Executed For:

Directorate Agricultural Engineering Hyderabad, Sindh

Total Capacity:

26.2 kWp

Categories:

Solar Tunnel Dryers

Name and location:

Supply of Solar Tunnel Dryers (10Nos) + Solar Pumps (8Nos) Hyderabad, Sindh

Solar Tunnel Dryers Sukkur

26.2 kWp Solar Tunnel Dryers

Solar Tunnel Dryers of 26.2 kWp capacity were installed in Hyderabad, Sindh.

EBR Energy

Reasons to Go Solar

We salute our entire team at EBR Energy