Work Executed For:
Leatherware (Pvt.) Ltd.

Total Capacity:
217.1 kWp

Categories:
Solar PV Grid Tied

Name and location:

217.08 KW Solar PV Grid Tied System for Leatherware (Pvt.) Ltd. Daska Road Sialkot

Leatherware (Pvt.) Ltd. goes solar with EBR Energy

217 kWp Solar-PV Grid Tied System at Leatherware (Pvt.) Ltd.

EBR Energy is providing complete turnkey services to Leatherware Pvt. Ltd in Sialkot, Pakistan. The
project entails providing an end to end solution for the solar system along with the facility of net-
metering. The goal of the project is to reduce dependence of the industry on the ever-increasing utility
grid rates and use a cheaper energy source though the implementation of a solar energy system.

EBR Energy

Reasons to Go Solar

We salute our entire team at EBR Energy